Tuesday June 7th period 4/5

Tons of work completed today! Stream bed was entirely dug out and measured with a downward slope flowing towards the drain. A large strip of wood was used with the level allowing for the most precise measurements. The board was laid in the middle with the level on top. Cloth was laid out covering the stream following the curves and turns. The land next to the stream was flattened out on both sides. More work to be done, but the progress has been great! A big thanks to The Front Page for donating sandwich wraps that were exquisite!